Select Page

PROJECT

CHEROKEE PIPELINE REPLACEMENT

Location: Glenpool, Oklahoma

Client: A Major Liquids Pipeline & Refining Company

Audubon Companies provided survey and mapping services to replace a 10″ pipeline from Glenpool, OK to Mt. Vernon, MO — a total of 272 miles. Our team played an integral role in supporting the engineering team during the Front-end loading (FEL) phase to finalize as-built documentation. Audubon Companies was responsible for the preliminary survey, routing, construction staking, construction alignment sheet preparation, as-built survey, and as-built alignment sheet documentation, as well as providing geographical information system (GIS) data to load into the Pipeline Open Data (PODS) GIS database.

PROJECT OVERVIEW

  • 10” Pipeline
  • 272 Miles Total

PROJECT SCOPE

  • Survey & Mapping
  • Front-End Loading (FEL) Phase to finalize as-built documentation support
  • GIS

Discover how we deliver value to our clients.

With our integrated EPC and field services, we deliver projects across the life cycle - safely and efficiently.