PALO Pipeline | Project | Surveying & Permitting | Audubon
PALO Pipeline | Project | Surveying & Permitting | Audubon
Client
Chevron Pipe Line Co.
Location
Mont Belvieu, Texas
Pipelines + Terminals

PALO Pipeline Survey + Permitting

Project overview

  • 80-mile pipeline removal & installation
  • Permanent & temporary pig traps
  • Mainline valve sites with remote operation
  • Upstream/downstream blowdown valves
  • Valve-site power updates/upgrades

Scope of work

Project summary

Chevron Pipe Line Company engaged Audubon for pipeline survey and permitting on its Port Arthur Line Optimization (PALO) effort. The optimization consisted of 8-in. pipeline removal and installation of 12- and 18-in. pipeline, routing, valve sites, and trap sites over nearly 80 miles through East Texas.

Audubon evaluated existing alignment sheets and CAD files to verify and validate the centerline, ground obstructions, and utility crossings. The team then established benchmarks using leading technologies and adhering to the operator’s geographic information system (GIS) standards; developed and issued Industry Foundation Classes (IFC) alignment sheets and plats; staked for construction; and surveyed valve- and trap-location grading. Permitting was completed by knowledgeable personnel for both environmental and nonenvironmental entities.

For construction, Audubon supplied as-built survey data, alignment sheets, and 90+ horizontal directional drill (HDD) drawings. Audubon’s precise data management throughout the project ensured material traceability, and our pipeline survey and permitting expertise enabled confident construction and startup for Chevron’s PALO project.

audubon

Discover how we deliver project excellence to our clients

With our multidisciplinary approach, we generate custom solutions in every phase of the project lifecycle.