Pipeline Integrity Management | Audubon
Pipeline Integrity Management | Audubon
Client
San Mateo Midstrem
Location
Loving, New Mexico
Pipelines + Terminals

Pipeline Integrity Management for Delaware Basin Crude

Project summary

Subject to pipeline integrity management rule 49 CFR Part 195.452San Mateo Midstream enlisted Audubon to identify high-consequence areas (HCAs) associated with the design and construction of a new crude oil pipeline in the Delaware Basin.

In accordance with Pipeline and Hazardous Materials Safety Administration (PHMSA) requirements, Audubon conducted crude pipeline integrity management services including emergency flow restriction device (EFRD) studies to determine pipeline centerline locations and leak detection capabilities, elevation and pipeline control, and element response times. A risk analysis was also performed based on credible pipeline integrity threats, and a qualitative risk analysis determined the probability of threat occurrence, failure consequences, and the cost of risks per mile of pipeline.

Audubon’s findings and recommendations assisted San Mateo Midstream with risk reduction, operational prioritization, and pipeline maintenance budgeting for its greenfield project.

Project overview

  • Greenfield project subject to PHMSA 49 CFR 195.452
  • Crude oil transportation & gathering pipeline
  • Cloud-based project management portal

Scope of work

  • HCA analysis
  • EFRD studies
  • Risk analysis
  • Mainline & check valve location recommendations
  • Preventative & mitigative recommendations
audubon

Discover how we deliver project excellence to our clients

With our multidisciplinary approach, we generate custom solutions in every phase of the project lifecycle.