PROJECT EXPERIENCE
Cherokee Pipeline Replacement
Cherokee Pipeline Replacement
Client:
A Major Liquids Pipeline & Refining Company
Location:
Glenpool, Oklahoma
Project Summary:
Audubon Companies provided survey and mapping services to replace a 10″ pipeline from Glenpool, OK to Mt. Vernon, MO — a total of 272 miles. Our team played an integral role in supporting the engineering team during the Front-end loading (FEL) phase to finalize as-built documentation. Audubon Companies was responsible for the preliminary survey, routing, construction staking, construction alignment sheet preparation, as-built survey, and as-built alignment sheet documentation, as well as providing geographical information system (GIS) data to load into the Pipeline Open Data (PODS) GIS database.
Project Overview:
- 10” Pipeline
- 272 Miles Total
Scope of Work:
- Survey & Mapping
- Front-End Loading (FEL) Phase to finalize as-built documentation support
- GIS