Cherokee Pipeline Replacement | Audubon Companies
Cherokee Pipeline Replacement | Audubon Companies
Client
Major Liquids Pipeline & Refining Company
Location
Glenpool, Oklahoma
Pipelines + Terminals

Cherokee Pipeline Replacement

Project overview

  • Replacement of 10-inch liquids pipeline
  • 272 miles across the midwestern US

Scope of work

  • Survey & mapping
  • As-built documentation
  • GIS & data management
  • Construction staking

Project summary

Audubon was contracted by a major liquids pipeline and refining company to provide survey and mapping services in support of a pipeline replacement project. The 10-inch Cherokee pipeline runs 272 miles from Glenpool, Oklahoma, to Mt. Vernon, Missouri.

Our team supplied preliminary and as-built surveys, routing, construction staking, and as-built alignment sheet documentation. Audubon also provided and loaded geographical information system (GIS) pipeline data into the Pipeline Open Data Standards (PODS) GIS database.

Audubon survey services played an integral role in keeping the Cherokee pipeline replacement project on schedule during front-end loading (FEL) and construction.

Related services we offer

Detailed Engineering + Design | Services | Audubon
Maximize project value with leading technologies and an agile, dedicated team.
Construction Management | Services | Audubon
Improve productivity and efficiency while reducing downtime and costs.
Asset Integrity+ Corrosion | Services | Audubon
Safely and reliably extend productive life with customized solutions that detect damage and combat corrosion.

Related news + insights

High-Voltage, High-Velocity | Article | Audubon
High-Voltage, High-Velocity
EPC for Dual Metering Stations | News | Audubon
EPC Project Momentum Continues with Dual Metering Stations in Texas
EPC for Southeast Texas Metering Station | News | Audubon
Audubon’s Integrated EPC Solutions Mobilized for Southeast Texas Metering Station