PROJECT EXPERIENCE

Cove Point LNG Terminal

  1. Home
  2.  | 
  3. Project
  4.  | Cove Point LNG Terminal

Cove Point LNG Terminal

Dominion Energy Cove Point | Audubon Companies | Gas Processing Technologies and LNG

Client:

Dominion Energy

Location:

Lusby, MD

Project Summary:

From engineering to construction and operations, Audubon served as the owner’s engineer and managed the front-end engineering and design (FEED) for all phases of Dominion Energy’s Cove Point liquefied natural gas (LNG) project.

Dominion received design environmental assessment approval from the Federal Energy Regulatory Commission (FERC) in 2014. The new liquefaction facility is integrated with the existing resources of the Cove Point LNG Terminal and shares common resources, including LNG tanks, pumps, piping, and a pier for the import and export of LNG.

Project Overview:

  • Bi-directional LNG terminal
  • 750 million SCF
  • APCIC3/MR technology
  • Total liquefaction capacity: 5.25 MTP
  • Storage capacity: 14.6 BCF
  • FERC regulated facility

Scope of Work:

  • Owner’s engineer services
  • FEED studies management
  • EPC selection
  • Project management
  • Technical review of the LNG facility design & process related aspects
  • Environmental compliance
  • Operational readiness support
  • Regulatory compliance support
  • Commissioning & startup support