Bayou Carlin Shallow Water Facility

  1. Home
  2.  | 
  3. Project
  4.  | Bayou Carlin Shallow Water Facility

Bayou Carlin Shallow Water Facility

Bayou Carlin Shallow Water Facility | Audubon Companies | Offshore Deepwater EPC Oil & Gas

Client:

McMoran Oil & Gas LLC

Location:

St. May Parish, LA

Project Summary:

Audubon Companies provided project management, construction management, I&E inspection, and paint inspection for the Bayou Carlin shallow water facility. Our team out-fitted a 195 ft. x 35 ft. barge with equipment to produce 50 MMCFD and oversaw installation of the 8′′ pipeline with two underground bores at 4,800 ft. and 3,000 ft. The total length of the pipeline was 18,000 feet. Additional services involved cost tracking, procurement support, and vendor surveillance.

Project Overview:

  • 50 MMCFD Gas Facility
  • 195 ft. X 35 ft. Barge
  • Three 1,500 BBLS Tanks for Oil & Water Storage
  • 18,000 ft. of 8-in./S80 Pipeline
  • Two Underground Bores: 4,800 ft. and 3,000 ft.

Scope of Work:

  • Project Management
  • Construction Management
  • I&E Inspection
  • Paint Tracking
  • Cost Tracking
  • Procurement
  • Vendor Surveillance