Augustus Pipeline | Project | Audubon
Augustus Pipeline | Project | Audubon
Client
Centurion Pipeline L.P.
Location
Midland to Crane, TX
Pipelines + Terminals

Augustus Pipeline

Project overview

  • 30 miles
  • Crude oil

Scope of work

  • Preliminary title
  • Survey permission
  • Easement acquisition
  • Ministerial permitting
  • Preliminary survey and design
  • Construction staking and as-built
  • ROW construction support

Project summary

Audubon completed the ROW and survey scope for the Augustus Pipeline project. The project moves 150,000 barrels of crude oil per day from the Midland terminal to multiple long haul customers.

Related services we offer

Detailed Engineering + Design | Services | Audubon
Maximize project value with leading technologies and an agile, dedicated team.
Construction Management | Services | Audubon
Improve productivity and efficiency while reducing downtime and costs.
Asset Integrity+ Corrosion | Services | Audubon
Safely and reliably extend productive life with customized solutions that detect damage and combat corrosion.

Related news + insights

High-Voltage, High-Velocity | Article | Audubon
High-Voltage, High-Velocity
EPC for Dual Metering Stations | News | Audubon
EPC Project Momentum Continues with Dual Metering Stations in Texas
EPC for Southeast Texas Metering Station | News | Audubon
Audubon’s Integrated EPC Solutions Mobilized for Southeast Texas Metering Station