PROJECT EXPERIENCE

Pecan Island Field Development Project

  1. Home
  2.  | 
  3. Project
  4.  | Pecan Island Field Development Project

Pecan Island Field Development Project

Pecan Island Field Development Project

Client:

Freeport-McMoRan

Location:

Pecan Island Field, Vermilion Parish, Louisiana

Project summary:

Audubon provided project management and construction management, coating inspection, and I&E inspection on the Pecos platform, a single-level 48-foot caisson deck with a heliport. The facility was engineered to flow 15 million standard cubic feet per day (MMSCFD) of oil and manage 400 barrels of condensate.

The scope of work also included the procurement and cost tracking on all phases of the project. The team installed a 6 in. pipeline running from Pecos to Harvest SL-3763. The project team also added a new separator on the Harvest platform to manage production from the Pecos platform and oversaw the offshore installation of the separator, pipeline, caisson deck, and helideck.

Project overview:

  • Single-level 48 ft. caisson deck with a heliport
  • 6 in. pipeline approximately 6 miles long
  • Oversight of the caisson deck, helideck, separator, & pipeline installation
  • 15 MMSCFD
  • 400 barrels of condensate

Scope of work:

  • Project management
  • Construction management
  • Coating inspections
  • I&E inspections
  • Procurement & cost-tracking