Jacksonville LNG | Project | Audubon
Jacksonville LNG | Project | Audubon
Client
WesPac Midstream
Location
Jacksonville, Florida
LNG

Jacksonville LNG

Project overview

  • Greenfield project
  • LNG production capacity of 130,000 GPD
  • Amine unit and molecular sieve dehydration for conditioning of inlet gas
  • Gas compression
  • LNG storage
  • Plant utilities & infrastructure
  • Truck & marine loading

Scope of work

  • Project management
  • Engineering oversight
  • Schedule coordination
  • Cost control
  • Contract negotiation

Project summary

Audubon was selected to provide detailed engineering, design, and project management services for a 130,000 gallon a day (GPD) greenfield liquefied natural gas (LNG) production facility. Located in Jacksonville, Florida, the facility is the first small-scale LNG facility in the United States with the capability to load LNG into both marine vessels and trucks.

10 megawatt solar power generation units (Solar Taurus) were designed and installed as the primary power sources with buy-back capabilities to the grid. The LNG process area and balance of plant engineering and design were also included in the scope of work.

The Jacksonville LNG facility was designed to expand production capacity to an additional 480,000 GPD, as needed.

audubon

Discover how we deliver project excellence to our clients

With our multidisciplinary approach, we generate custom solutions in every phase of the project lifecycle.