Bayou Carlin Shallow Water Facility | Project | Audubon
Bayou Carlin Shallow Water Facility | Project | Audubon
Client
McMoran Oil & Gas LLC
Location
St. May Parish, LA
Offshore Oil + Gas

Bayou Carlin Facility

Project overview

  • 50 MMCFD gas facility
  • 195 ft. X 35 ft. barge
  • Three 1,500 BBLS tanks for oil & water storage
  • 18,000 ft. of 8 in. S80 pipeline
  • Two underground bores: 4,800 ft. and 3,000 ft.

Scope of work

  • Project management
  • Construction management
  • I&E inspection
  • Paint tracking
  • Cost tracking
  • Procurement
  • Vendor surveillance

Project summary

Audubon provided project management, construction management, I&E inspection, and paint inspection for the Bayou Carlin facility. Our team out-fitted a 195-foot by 35-foot barge with equipment to produce 50 million cubic feet per day (MMCFD) of oil. Audubon also oversaw the installation of an 8-inch, 18,000-foot pipeline with two underground bores—one at 4,800 feet and another at 3,000 feet. Additional services for the shallow water facility included cost tracking, procurement support, and vendor surveillance.

Related services we offer

Detailed Engineering + Design | Services | Audubon
Maximize project value with leading technologies and an agile, dedicated team.
Construction Management | Services | Audubon
Improve productivity and efficiency while reducing downtime and costs.
Asset Integrity+ Corrosion | Services | Audubon
Safely and reliably extend productive life with customized solutions that detect damage and combat corrosion.

Related news + insights

Applying the FEED Phase to Reengineer the Future of Oil + Gas
Esteban Ramos
Esteban Ramos
Country Manager, Audubon
Audubon Chosen for bp Kaskida Engineering | News | Audubon
Audubon Chosen for FPU Engineering on bp Kaskida Project in the Gulf of Mexico
May. 5, 2023|
Blog|
Common Key Performance Indicators in Oil and Gas