PROJECT EXPERIENCE

HVGO Piping Upgrade and CW Piping Replacement

  1. Home
  2.  | 
  3. Project
  4.  | HVGO Piping Upgrade and CW Piping Replacement

HVGO Piping Upgrade and CW Piping Replacement

HVGO Piping Upgrade and CW Piping Replacement | Audubon Companies | Petrochemical and Refining

Client:

Marathon

Location:

Texas

Project Summary:

Audubon Companies performed a FEED, detailed engineering and design, procurement, and construction management for the replacement of defective cooling water piping and valves approximately 7,000 ft. and 30” pipe. This also included 2,600 ft. of HVGO piping to 317L, with upgrades to all control valves and instrumentation. Project involved identifying TAR and non-TAR work for an expedited construction schedule.

Project Overview:

  • Replace In-Kind and Upgrade Metallurgy to 317L
  • Validate / Update and Develop Block Flow Diagram
  • Stress Analysis
  • Pipe Rack Upgrades
  • Brownfield Expansion
  • Instruments Spec Updates
  • Process Hydraulics Validations
  • Relief System Analysis

Scope of Work:

  • Project Management
  • Procurement & Expediting
  • FEED Engineering
  • Detail Engineering & Design
  • Automation & Controls
  • Construction Management & Inspection
  • Process Safety Analysis