PROJECT EXPERIENCE

Mont Belvieu Benzene Saturation Unit

  1. Home
  2.  | 
  3. Project
  4.  | Mont Belvieu Benzene Saturation Unit

MONT BELVIEU BENZENE SATURATION UNIT

Targa Benzene Saturation Unit | Audubon Companies

Client:

Targa Resources

Location:

Mont Belvieu, Texas

Project summary:

Audubon was enlisted by Targa Resources for detailed engineering and design, procurement, project management, construction, and automation and control of a benzene saturation unit at its facility in East Texas. The brownfield facility expansion serves the company’s network of integrated gathering pipelines and processing plants across Texas and Louisiana.

To meet specifications, the benzene saturation unit was designed to hydrogenate low-sulfur natural gas and convert benzene to cyclohexane. Audubon’s services ensured integration with other plant utilities, including flare, drain, power, and instrument air. The robust solutions provided to Targa Resources allowed for regulatory compliance and effective benzene reduction.

Project overview:

  • Brownfield expansion
  • Benzene saturation
  • Fractionation
  • Absorption & product treatment
  • Reactor design
  • Product transfer pumps & metering
  • Plant utility integration

Scope of work:

  • Front-end engineering & design (FEED)
  • Detailed engineering & design
  • Project management
  • Procurement
  • Construction
  • Automation & control
  • Process safety analysis