Elk Creek Pipeline Engineering

Project overview

  •  820-mile, 20-inch NGL pipeline
  • 240,000-BPD NGL capacity
  • 65 valve sites
  • 14 pump stations, 4 original and 10 future manifold installations

Scope of work

  • Pipeline engineering
  • Project management
  • Construction support
  • Materials management
  • Facilities design
  • Route development
  • Mapping design
  • Fabrication

Project summary

ONEOK’s Elk Creek pipeline is a 20-inch, nearly 820-mile pipeline transporting natural gas liquids (NGLs) from eastern Montana to its facilities in Bushton, Kansas. With 65 valve sites, 14 pump stations, and capacity for 240,000 BPD of NGLs, pipeline engineering and design required significant support and expertise.

Audubon was enlisted by the midstream services company for project managementengineeringfabrication, facilities design, and mechanical-electrical-civil design on the pipeline. Audubon also managed materials procurement, route development, mapping design, change coordination, and as-built documentation.

After support from Audubon to engineer, design, fabricate, and project-manage the Elk Creek pipeline, ONEOK achieved full completion of the pipeline and began flowing NGLs from the productive Williston, Powder River, and Denver-Julesburg basins.

Related services we offer

Detailed Engineering + Design | Services | Audubon
Maximize project value with leading technologies and an agile, dedicated team.
Construction Management | Services | Audubon
Improve productivity and efficiency while reducing downtime and costs.
Asset Integrity+ Corrosion | Services | Audubon
Safely and reliably extend productive life with customized solutions that detect damage and combat corrosion.

Related news + insights

Pipeline Safety | PHMSA Issues New Rules | Audubon
Mar. 16, 2020|
Blog|
Are You Ready? PHMSA Issues New Rules to Overhaul Pipeline Safety – Part 2
Pipeline Safety | PHMSA Issues New Rules | Audubon
Feb. 11, 2020|
Blog|
Are You Ready? PHMSA Issues New Rules to Overhaul Pipeline Safety – Part 1
Depth of cover surveys | Audubon
Jan. 13, 2018|
Blog|
How Do Depth-Of-Cover Surveys Protect Pipelines?