PROJECT EXPERIENCE
Targa Benzene Saturation Unit
TARGA BENZENE SATURATION UNIT
Client:
Targa Resources
Location:
Texas
Project Summary:
Audubon Companies performed FEED, EPC (engineering and design, procurement, and construction), automation and control for the installation of the Targa facility. The facility design intent will saturate/hydrogenate the low sulfur natural gasoline stream (LSNG) and convert the benzene to cyclohexane, to meet product specifications at the Mont Belvieu, Texas site.
Project Overview:
- Benzene Saturation Process
- Saturate/Hydrogenate Low Sulfur Natural Gasoline and Convert Benzene to Cyclohexane
- Fractionation
- Absorption/Product Treating
- Reactor Design
- Product Transfer Pumps & Metering
- Plant Utility Integration (Flare, Drain, Power, Instrument Air)
- Brownfield Expansion
Scope of Work:
- Project Management
- Procurement
- FEED Engineering
- Detail Engineering & Design
- Automation and Control
- Construction
- Process Safety Analysis