McMoRan – Davey Jones II

freeport-mcmoran-oil-gas-davey-jones-ii

Audubon Companies provided project management, construction management, and vendor surveillance for the fabrication outfitting and offshore installation of an eight pile and four pile platform. During the design phase Audubon Companies was fully integrated with the client’s project management team and provided constructability reviews, contractor assessments, and operability input for two ultra-deep gas production facilities. Based in Metairie, Louisiana, the construction team coordinated with contractors and vendors, and managed onshore and offshore logistics throughout south Louisiana and south Texas.

Project Overview

  • Ultra Deep Gas Wells Capable of Producing 100 mmscfd
  • 30,000# Production Tree
  • 20’’ Pipeline
  • 8’’ Pipeline
  • Amine Plant
  • 8-Pile Production Deck
  • 4-Pile Production Deck

Project Scope

  • Fabricated one-8 Pile Production Platform
  • Fabricated one-4 Pile Production Platform
  • Fabricated Jacket and Piles to Accommodate the
  • 8-Pile and 4-Pile Decks
  • ICP Piping
  • Production Equipment
  • Pipelines
  • 60’’ Caisson and 48’’ Piles